What we're doing

This project is to upgrade water pipes, so you can always rely on us when you need a drink, a bath or to wash the clothes or dishes.

You shouldn’t notice any change to your water or sewerage services while we work. 

If we need to interrupt your water supply, don’t worry.  We will notify you in advance to organise connection to a temporary supply.

When it's happening

We started work in late March and planned to finish in late April. Due to unexpected delays, construction is expected to finish in mid-June (depending on the weather). 

We’ll work at night, because it’ll be safer for us with less traffic and pedestrians. It’ll also mean people can easily access local businesses and shops during the day.

You can expect us to work Sunday to Thursday between 8pm and 6am. On the odd occasion, we might need to work at other times for safety, technical or permit reasons. 

We'll be undertaking night works on South Road, Moorabbin. You can expect us to work on 17 June, depending on the weather. Working hours will be Monday 7:00pm to Tuesday morning 6:00am.

What might impact you

We’ll do our best to keep impacts to a minimum, however these are the kinds of things you might notice while we work:

  • More trucks on the streets around you.
  • Fewer car parks around the work zones.
  • Noise from machinery, like beepers when trucks reverse.
  • Lights as we work at night.
  • A change in normal traffic flow.
  • You’ll notice that our traffic management team are around too, to make sure people, bikes and cars can move around safely.

We're sorry about the noise, to keep it to a minimum we'll undertake loud activities before 11pm when we can. This may not be possible due to permit requirements. If you require ear plugs please see the crew on site.

Want to know more? Watch our video 'What you might hear and see' below.

Don't miss these details

We’re working with Interflow to help us with this project.

If you’re a business, you’ll need to make sure that the works and any interruption to water supply don’t affect your emergency fire plan. You’ll also need to let your insurer know.

If connected to a temporary water supply and you need to isolate water coming inside your property, please use the ball valve handle on the pipe, just before your water meter, to turn off your water. Alternatively, contact us on 1800 814 900 for assistance.

When we’ve finished the job, we’ll leave things how we found them and make sure we return any areas we’ve impacted as close as possible to their original condition. Reinstatement may take until late June.

Where we will be working

Blue legend icon  Location of pipeline to be upgraded

What you might hear and see

Frequently Asked Questions

Our infrastructure renewal program involves replacing, maintaining and upgrading the existing water and sewerage infrastructure above and below the ground, so you can always rely on us when you need a drink, a bath, to wash the clothes or dishes and every time you flush or send water down the drain.

The Water Renewal Program involves replacing water mains in nature strips and roadways.

The rehabilitation and/or replacement of the water main will:

  • Improve water service reliability
  • Reduce potential property damage if the water main were to fail
  • Reduce maintenance and repair costs of the water main

South East Water will provide notices of their intention to work in an area prior to the work commencing. If the works are deferred, we will send you another notification of the new proposed start date. South East Water will install project signage at the work area approximately three days prior to commencing the works. 

The new water main will be laid in the nature strip or, if necessary, in the road. Wherever possible, trenchless construction techniques will be used to minimise disturbance to the community.  

All works, including service connections, have been carefully planned to minimise any disruptions to your water service. Water will remain available throughout construction unless otherwise advised. We will notify you at least 48 hours in advance of any planned service disruptions. If you have any water supply requirements other than normal domestic or business use (e.g. health related needs), please let us know so that we can arrange an alternative water supply. 

During the course of the works, and depending on the renewal methodology, we may need to supply your property with water via a temporary service pipe, which will ensure minimal disruption to your water services. The temporary water supply is supplied via a small diameter plastic service pipe (usually black, blue or white) running along the front of the affected properties in your street.

 We work closely with affected businesses to minimise disruption wherever possible and determine the most suitable time to complete the works. Businesses with fire services should note that water will not be provided for sprinkler systems during construction if temporary water services are used during construction. 

At various locations along the water main alignment, the pipe may be laid across property driveways. In most cases, the construction crew will be able to drill underneath driveways so that customers can access their property at all times. Where drilling is not possible, we will adopt an open cut excavation method. In the event where driveway access is impacted, we will notify you well in advance so that alternative access arrangements can be made.

In the event when temporary pipe is laid across driveways the Project Team will install crossing ramps designed for normal vehicle use. Please ensure drivers use the ramps at a slow speed without stopping. Damage may occur to the temporary pipes if drivers stop and restart on top of the ramp.

Immediately after the works are complete, we will apply top soil and seed to grassed areas affected by the works and, where possible, reinstate the area to its original condition. The Project Team will also repair any impacts to the road, footpath and driveways or arrange for these to be repaired by Council. We will provide you with further information about temporary and permanent reinstatement works once the water main renewal work is complete. 

There is no cost to the property owner for these works. 

Need to get in touch?

We're here to help.

South Road, Moorabbin - REF # 1142392

Contact us via phone

1800 814 900

Contact us via email

renewals@sew.com.au

Contact us via post

Water and Sewer renewals
PO Box 2268
Seaford VIC 3198

Translator Interpreter Service
All languages 03 9280 0779

 

National Relay Service (NRS)
TTY: 13 36 77 (ask for 131 851)