Recycled water works in your area from mid February 2025

 

You might not notice a lot of the work we do because most of it is beneath your feet. Every day, we’re maintaining and upgrading the pipes and pumps that keep water and the sewage network flowing.

With some upcoming works in Ballarto Road, Yallambee Road and Manks Road, Clyde you might see us or our Industry Partner ABK (Abergeldie, BMD, KBR) around. Here’s what to expect while we get the job done.

What we're doing

This project is to construct a transfer main for Class C recycled water to connect the Blind Bight Water Recycling Plant to an existing pipeline on Ballarto Road. This will enable the network to continue to run smoothly in the area and ensure we continue to meet environmental complaince regulations.

Class C recycled water cannot be supplied for residential use for health and safety reasons.

For more information about Class C recycled water, please see the Infographic under the heading "Documents" below. 

You shouldn’t notice any change to your water or sewer services while we work.

When it's happening

We're planning to start work from mid February 2025 until late October 2025. It should take around 8 months to complete (depending on the weather). 

You can expect us to work Monday to Friday between 7 am and 5 pm. On the odd occasion, we might need to work at other times for safety, technical or permit reasons.

What might impact you

We’ll do our best to keep impacts to a minimum, however these are the kinds of things you might notice while we work:

  • Change in normal traffic flow on Ballarto, Manks and Yallambee Roads. 
  • Yallambee Road closure between Derricks and Manks Roads from 23 April for approximately 11 weeks.  Detours will be in place. Local access will be maintained for properties within the road closure area. 
  • Reduced speed limits will be in place. 
  • More trucks on the streets around you. 
  • Construction noise from machinery including beepers when trucks reverse and the use of heavy machinery. 
  • Intermittent lane closures on Ballarto, Yallambee and Manks Roads, Clyde.  Traffic controllers will guide you through the area. 

Want to know more? Watch our video 'What you might hear and see' below.

Don't miss these details

We’re working with ABK to help us.

During the works ABK will have a temporary site compound at 395 Yallambee Road, Clyde which will be secure and adhere to strict safety requirements.

When we’ve finished the job, we’ll leave things how we found them and make sure we return any areas we’ve impacted as close as possible to their original condition.

Where we will be working

What you might hear and see

Frequently Asked Questions

Our infrastructure program involves replacing, maintaining and upgrading the existing water and sewerage infrastructure above and below the ground, so you can always rely on us when you need a drink, a bath, to wash the clothes or dishes and every time you flush or send water down the drain.

ABK will undertake these works on behalf of South East Water.

No. If you experience any disruption to your water or sewerage services please call our 24/7  Faults and Emergencies team on 13 28 12.

During these works we may need to block your driveway access. If this is necessary, we will notify you in person and where possible, provide at least 24 hours' notice so that alternative parking arrangements can be made.

To safely undertake these works, traffic conditions may change so please take care when travelling around the construction sites. 

Construction hours will be Monday to Friday between 7am and 6pm. If Saturday works are necessary, they will take place between 8am and 5pm. On the odd occasion, we might need to work at other times for safety, technical or permit reasons.

Construction will start in mid February 2025 and take approximately 8 months to complete, including reinstatement of road surfaces.

South East Water and their appointed Industry Partner, ABK, will keep you informed about the project and construction in your area. We'll also keep this webpage up to date.

During the investigative works ABK will have a temporary site compound at 395 Yallambee Road, Clyde as agreed with Council. The compound will be secure and adhere to strict safety requirements. 

The construction methods chosen are not likely to cause high levels of dust and vibration. The project team will carry out regular site area inspections during high volumes of work to monitor for the safety and comfort of local residents and the community.  There will be periods of noise from machinery and drilling rigs. The crew will try to keep noisier works to a minimum between 7 am and 9 am. 

There is no cost to the property owner for these works. 

When we’ve finished the job, we’ll leave things how we found them and make sure we return any areas we’ve impacted as close as possible to their original condition.

Documents

Need to get in touch?

We're here to help.

Blind Bight Recycled Water Pipeline

Contact us via phone

1800 572 099

Contact us via email

engagement@sew.com.au 

Contact us via post

Blind Bight Pipeline
PO Box 2268
Seaford VIC 3198

Translator Interpreter Service
All languages 03 9280 0779

 

National Relay Service (NRS)
TTY: 13 36 77 (ask for 131 851)