Aquarevo Maintenance and Sampling
Maintenance and sampling works in your area from <month year>
With some upcoming works in <Streets, Suburb> you might see us or our delivery partner <name> around. Here’s what to expect while we get the job done.
Where we will be working
Current maintenance and sampling area.
Frequently Asked Questions
The population in Melbourne’s south-eastern suburbs is growing, placing pressure on the current sewerage system. These works will upgrade the capacity of the existing sewer, so that future growth can be met.
The works will:
• Improve service reliability into the future.
• Future proof the sewer network.
• Reduce ongoing maintenance and repair costs.
Site investigative works are/were....<timeframe> to inform the design of the sewer upgrade. Construction will start at <location> and progress along to <location> (refer to map above).
We will be installing relief sewer pipes and new concrete manholes along <streets>. The installation of relief pipes will be done through a process called underground micro tunnelling. This involves excavating up to four access shafts in stages along each of the streets listed above.
We will renew the sewer pipeline in sections of approximately <number> metres at a time. The works zones will involve some road closures and include temporary fencing and water barriers to ensure the safety of nearby residents and the local community.
Construction hours will be Monday to Friday between 7am and 6pm. If Saturday works are necessary, they will take place between 8am and 5pm. On the odd occasion, we might need to work at other times for safety, technical or permit reasons.
Construction will start in <early/mid/late month year> and take approximately <number weeks/months> to complete, including reinstatement of road surfaces.
The project will be completed in stages starting on <street> (please refer to map overleaf) moving to <streets>. If works progress well, we may start and finish some stages earlier than anticipated. We'll keep affected residents updated.
South East Water and their appointed contractor <contractor> will keep you informed about the project and construction in your area. We'll also keep this webpage up to date.
IF RELEVANT <Sections of the road along the works alignment will be closed for up to six to eight weeks at a time. Vehicle access to driveways in these sections of the road will be blocked. Pedestrian access to properties however will be maintained. The project team will notify affected properties in advance and advise of alternative parking arrangements. The crew will also be available to assist residents where possible. We’re sorry for the inconvenience and will work to make sure this is for as short a time as possible.>
During the works <contractor> will have a site compound on <location>. This location has been approved by council. The compound will be secure and adhere to strict safety requirements.
The construction methods chosen are not likely to cause high levels of dust and vibration. The project team will carry out regular site area inspections during high volumes of work to monitor for the safety and comfort of local residents and the community. There will be periods of noise from machinery and drilling rigs. The crew will try to keep noisier works to a minimum between 7 am and 9 am.
If you require property access due to a medical condition, please contact the <contractor> Project Manager <name> immediately on <phone> or <email>.
No. If you experience any disruption to your water or sewerage services please call our 24/7 Faults and Emergencies team on 13 28 12.
There is no cost to the property owner for these works.
When we’ve finished the job, we’ll leave things how we found them and make sure we return any areas we’ve impacted as close as possible to their original condition.
Need to get in touch?
We're here to help.