Investigative works in your area starting early November 2025

You might not notice a lot of the work we do because most of it is beneath your feet. Every day, we’re maintaining and upgrading the pipes and pumps that keep water flowing. With some upcoming works in Berkeley Court, Dalsten Grove, Gillards Rd and McCutcheon Cl, Mount Eliza you might see us or our delivery partner Beca, Fulton Hogan, Interflow Joint Venture (BFHI JV) around.

Here’s what to expect while we get the job done.

What we're doing

This project is to upgrade a critical water pipe, so you can always rely on us when you need a drink, a bath or to wash the clothes or dishes.

Initial investigative works are needed to help finalise the planning stage of this project before moving into construction. To do this, we need to undertake investigation works along the pipe and surrounding areas.

Works will involve:

  • CCTV inspection and profiling of the watermain
  • Soil investigations
  • Minor excavation along parts of the watermain
  • Service proving using non-destructive digging (NDD) to identify and locate all underground services that may interact with the pipeline alignment. NDD uses pressurised water to break up and vacuum soil to expose assets and services.

We'll be in touch with affected residents before any investigation works start.

When it's happening

We’re planning to start this early investigative work on the 5th of November, finishing late November. Works will be intermittent during this time however initial works should be completed within 4 weeks (depending on the weather).

You can expect us to work Monday to Friday between 7 am and 6 pm. On the odd occasion, we might need to work at other times for safety, technical or permit reasons.

We expect full construction to begin early 2026.

What might impact you

We’ll do our best to keep impacts to a minimum, however these are the kinds of things you might notice while we work:

  • More trucks on the streets around you.
  • Fewer car parks around the work zones.
  • Noise from machinery, like beepers when trucks reverse.
  • A change in normal traffic flow - our traffic management team will be around to make sure people, bikes and cars can move around safely.

 

Don't miss these details

We’re working with BFHI to help us.

When we’ve finished the job, we’ll leave things how we found them and make sure we return any areas we’ve impacted as close as possible to their original condition. 

Where we will be working

Proposed pipeline alignment

Frequently Asked Questions

Our infrastructure renewal program involves replacing, maintaining and upgrading the existing water and sewerage infrastructure above and below the ground, so you can always rely on us when you need a drink, a bath, to wash the clothes or dishes and every time you flush or send water down the drain.

The Water Renewal Program involves replacing water mains in nature strips and roadways.

The upgrade of the water main will:

  • Improve water service reliability
  • Reduce potential property damage if the water main were to fail
  • Reduce maintenance and repair costs of the water main

South East Water will provide notices of their intention to work in an area prior to the work commencing. If the works are deferred, we will send you another notification of the new proposed start date. If you're directly impacted, our project team will get in touch prior to works starting. 

The new water main will be laid in the nature strip or, if necessary, in the road. Wherever possible, trenchless construction techniques will be used to minimise disturbance to the community.  

All works, including service connections, have been carefully planned to minimise any disruptions to your water service. Water will remain available throughout construction unless otherwise advised. We will notify you at least 48 hours in advance of any planned service disruptions. If you have any water supply requirements other than normal domestic or business use (e.g. health related needs), please let us know so that we can arrange an alternative water supply. 

During the course of the works, and depending on the renewal methodology, we may need to supply your property with water via a temporary service pipe, which will ensure minimal disruption to your water services. The temporary water supply is supplied via a small diameter plastic service pipe (usually black, blue or white) running along the front of the affected properties in your street.

 We work closely with affected businesses to minimise disruption wherever possible and determine the most suitable time to complete the works. Businesses with fire services should note that water will not be provided for sprinkler systems during construction if temporary water services are used during construction. 

At various locations along the water main alignment, the pipe may be laid across property driveways. In most cases, the construction crew will be able to drill underneath driveways so that customers can access their property at all times. Where drilling is not possible, we will adopt an open cut excavation method. In the event where driveway access is impacted, we will notify you well in advance so that alternative access arrangements can be made.

In the event when temporary pipe is laid across driveways the Project Team will install crossing ramps designed for normal vehicle use. Please ensure drivers use the ramps at a slow speed without stopping. Damage may occur to the temporary pipes if drivers stop and restart on top of the ramp.

Immediately after the works are complete, we will apply top soil and seed to grassed areas affected by the works and, where possible, reinstate the area to its original condition. The Project Team will also repair any impacts to the road, footpath and driveways or arrange for these to be repaired by Council. We will provide you with further information about temporary and permanent reinstatement works once the water main renewal work is complete. 

There is no cost to the property owner for these works. 

Need to get in touch?

We're here to help.

Berkeley Court, Mount Eliza

Contact us via phone

1800 403 777

Contact us via email

engagement@sew.com.au

Contact us via post

Water and Sewer renewals
PO Box 2268
Seaford VIC 3198

Translator Interpreter Service
All languages 03 9280 0779

 

National Relay Service (NRS)
TTY: 13 36 77 (ask for 131 851)