Sewer pipeline works complete

You might not notice a lot of the work we do because most of it is beneath your feet. Every day, we’re maintaining and upgrading the pipes and pumps that keep water flowing.  

What we're doing

The Ti Tree Creek Branch Sewer Duplication project has installed a new sewer pipeline in Berwick to increase the reliability of the network and reduce the risk of spills into the environment. We've worked with Fulton Hogan Delplant Beca Joint Venture (FHDB) to help us.

Pipeline works complete 
We have now completed the connections of the new sewer pipeline into the sewerage network. Thanks for your patience whilst we completed these works at night during off-peak sewage flows. 

When it's happening

Final works were completed in November 2025.

What might impact you

The Ti Tree Creek Branch Sewer Duplication project is now complete. Thank you for you patience whilst we completed these essential works.

Don't miss these details

Final connections to the new sewer pipeline are now complete. 

We have returned any areas we’ve impacted as close as possible to their original condition.

Where we will be working

What you might hear and see

Frequently Asked Questions

We manage an infrastructure program which involves replacing, maintaining and upgrading the existing water and sewerage infrastructure above and below the ground, so you can always rely on us when you need a drink, a bath, to wash the clothes or dishes and every time you flush or send water down the drain.

FHDB will complete these works on behalf of South East Water. 

During construction we may need to block your driveway access. If this is necessary, we will notify you in person and where possible, provide at least 24 hours' notice so that alternative parking arrangements can be made.

To safely undertake these works, traffic conditions may change so please take care when travelling around the construction sites. 

No. If you experience any disruption to your water or sewerage services please call our 24/7 Faults and Emergencies team on 13 28 12.

 

When we’ve finished the job, we’ll leave things how we found them and return any areas we’ve impacted as close as possible to their original condition. 

There is no cost to the property or business owner for these works. 

Need to get in touch?

We're here to help.

Ti Tree Creek Branch Sewer Duplication

Contact us via phone

1800 407 877

Contact us via email

engagement@sew.com.au

Contact us via post

Ti Tree Creek Sewer Duplication
PO Box 2268
Seaford VIC 3198

Translator Interpreter Service
All languages 03 9280 0779

 

National Relay Service (NRS)
TTY: 13 36 77 (ask for 131 851)