Verification forms


Form A – Works Application (lodge online)
​Used when applying for conditions that require the construction of works for the provision of water supply and sewerage services. ​ ​
Form B – Intention to Proceed (docx, 75Kb)
​To be lodged with South East Water to avoid the Development Agreement lapsing if unable to be executed within three months from the Offer Letter date.
Form C – Design Verification (docx,263Kb)
​To be submitted with the Design Drawings at the end of design.
Form D – Pre-Construction Verification (docx, 269Kb)
​To be submitted at least five working days before the commencement of construction. ​ ​
Form E – Construction Verification (docx, 269Kb)​​
​To be submitted at the end of construction. ​ ​
Form F – End of Defects Verification (docx, 93Kb)​​
​To be submitted after the defects liability period has expired and the construction of common roads and all other services within the subdivision have been completed. ​ ​
Form G – Verification Form Attachment (docx, 123Kb)​​
To be submitted with the verification forms if any of the items can not be verified.​ ​ ​
Form H – Document Comments (docx, 83Kb)​​
​Used for any suggestions or comments regarding the documentation.​
Form I – Non Works Application (lodge online)
Used when applying for conditions that doesn't require the construction of works for the provision of water supply and sewerage services.​
Form J – Acceptance of Subdivision Digital Information (docx, 94Kb)​​
​Used when submitting the subdivision plan information on disk to South East Water with the application. ​ ​
Form K – Acceptance of Digital Information (docx, 93Kb)​​​
​Used when submitting As-Constructed information to South East Water on disk.
Form L – Field Note Acceptance (docx, 92Kb)​​​​
​Used when submitting As-Constructed information to South East Water in hard copy format.
For​m M – Pump Station Design Verification (docx, 134Kb)​​​​
​To be submitted with the Design Drawings for Sewerage Pump Stations at the end of design.
Form N – Pump Station Preconstruction Verification (docx, 263Kb)​​​​
To be submitted at least five working days before the commencement of construction of the Sewerage Pump Station.​ ​ ​
Form O – Pump Station Construction Verification (docx, 94Kb)​​​​
​To be submitted at the end of construction of the Sewerage Pump Station.​ ​
Form P – Pump Station End of Defects Verification (docx, 135Kb)​​​​
​To be submitted after the defects liability period has expired and the construction of common roads and all other services within the subdivision have been completed.
Form Q – Work on Live Sewers (docx, 88Kb)​​​​
To be used for all works associated with live sewers including lifting maintenance hole covers, entering maintenance holes, altering maintenance holes connecting to maintenance holes, connecting property branches or insertion / removal of plugs etc.​ ​ ​
Form R – Sewerage Easement (docx, 39Kb)​​​​
Form R – Water Easemen (docx, 40Kb)​​​​
Form R is to be updated & submitted to South East Water to verify the completion of verification forms C,D,E,F,K, & L. which are to be retained by the consulting engineer.​ ​ ​
Form S – Request for Water Main Shutdown (docx, 124Kb)​​​​
To be submitted to South East Water at least five working days prior to the requested day of shutdown.​
Form T – Testing Notification (docx, 86Kb)​​​​​
To be submitted to South East Water at least two working days prior to any tests being carried out.​